Hi guys! Hoping some of you have some insight, since this is my first time ordering. Order confirmed on 11/24 - 401A, twin panel moonroof. Set for production on 2/7, then moved up to 1/17. Went into production 1/19. Per my dealer, it was built on 1/19 then moved offsite (which I tracked via palsapp) to Manheim Auto Auction. Dealer told me this was common for adding additional items after production. Cool, no problems there. However, I had an estimated delivery date of 2/18 which moved this morning to 5/19. I've checked the as built data which shows BCE modules are loaded but no PCM. I can only assume this is part of the hold up. I plan to call the dealer on Monday to see if there's a note in the visibility report but wanted to see if anyone else has hit the same problems. I had zero urgency when I ordered it, but knowing it's sitting in a random lot *mostly* ready makes me a little impatient lol!