Confirmed 12/3 for me and nothing yet. I still don’t understand how a 12/22 order goes through before a 12/3?
With my '21 F-150 Lariat (emphasis on the Lariat), a big hold up was the moonroof. I did not have it, but with the spray-in bedliner added to the moonroof, it was considerably longer to have it built. I had the s-i bedliner, so those without it (choosing to opt for Line-X) received theirs even quicker. Also, I had a KC build, but having a Detroit build made it even worse for a variety of reasons!
The same held true to my '21 Bronco Sport. The moonroof (can't stand those things!) and the crossbars (not the siderails) held up many of those builds. I opted out of both and my build was quite quick.
Of course, all of this was in 2020. ALOT has happened since the building both vehicles, not the least is the chip shortages.
So frustrating to see this happen in our country. So freakin' frustrating!